Before You Install Software

2-5

 

TX

 

TX

L

ACT

N

10

K

100

ACT

10LNK

100LNK

ACT: Off until the network driver is installed;

after driver installation, yellow indicates port traffic

10 LNK: Green indicates 10 Mbps link integrity

100 LNK: Green indicates 100 Mbps link integrity

Figure 2-3NIC LEDs at Power Up

Before You Install Software

Before you install a software driver, you may want to run the Configuration and Diagnostic Program, as described in Chapter 4.

See the instructions in Chapter 3 to install the driver from the 3Com diskette. For information on LED states after the software is installed, see Table 4-1 in Chapter 4.

Be sure that the NIC hardware and software are installed correctly before replacing the computer cover.

Page 17
Image 17
3Com Server manual Before You Install Software