Chapter 2: Prepare the Site
Rack and Clearance Requirements
Tipping Point recommends that you mount the TippingPoint
Ventilation and Location
Ventilation and proper location are essential to the proper operation of the TippingPoint
•When mounting this unit in a partially filled rack, load the rack from the bottom to the top, with the heaviest component at the bottom of the rack.
•Ensure that the unit is positioned properly on the rack
•There should be a minimum clearance of three inches (7.62 cm) at the ventilation openings.
•When mounting this unit in an enclosed or
Environmental Requirements
In order for the TippingPoint
The following table lists the recommendations for temperature, humidity, and altitude settings for the Service Provider (SP) environment.
Table 2 - 1: Environmental Requirements for the TippingPoint
Environmental | Description | |
Specifications | ||
| ||
|
| |
|
| |
Temperature | 0 to 40 ° C (32 to 104 ° F) — Operating | |
| ||
|
| |
Humidity | 5 to 95% | |
|
| |
Altitude | No degradation up to 13K feet above sea level | |
|
|
Reliable Earthing
Ensure the mounting rack is reliably connected to earth.
System Grounding Requirements
Damage from Electromagnetic Static Discharge (ESD) can occur when electronic components are improperly handled. This damage can result in complete or intermittent system failures. Proper ESD
12