
Unpack the TippingPoint System
protection is required whenever you handle equipment. It is not necessary to open the TippingPoint chassis to add or remove any components.
Unpack the TippingPoint System
Each system chassis is securely packaged in a shipping box.
CAUTION: ESD can damage the TippingPoint
Use caution when opening the TippingPoint
To unpack the TippingPoint X-Series system
STEP 1
STEP 2
STEP 3
STEP 4
STEP 5
STEP 6
STEP 7
Inspect the packing container. If you see any damage or other signs of mishandling, inform both the local freight provider and TippingPoint before unpacking. Your freight provider can provide you with the procedures necessary to file a claim for damages.
Carefully open the box.
Remove all packing material.
Verify the contents in the shipping package. Compare the packing list to your shipment and to your order. If items are missing, contact your TippingPoint sales or field representative.
Remove the chassis from the box.
Open the accessory kit. It contains the cables, documentation, and management software.
Inspect all the equipment inside for damage. If you think any equipment might be damaged, contact your freight provider for how to lodge a damage claim and contact your TippingPoint sales or field representative for instructions.
Please Recycle: The shipping materials are recyclable. Please save for later use or dispose of them appropriately.
13