3M 40800 Unpacking, Uncrating, Removal of Pallet, Figure, Disposal of Packaging Materials

Models: 40800

1 126
Download 126 pages 4.35 Kb
Page 29
Image 29
6-UNPACKING

6-UNPACKING

6.1 Uncrating

The envelope attached to the shipping box contains the uncrating instructions of the machine (Figure 6-1).

Removal of Pallet

Loosen and remove nuts and brackets using the open end spanner supplied in the tool box (Figure 6-4).

Figure 6-1

Figure 6-4

 

Cut straps. Cut out staple positions along the bottom of the shipping box (or remove staples with an appropriate tool - Figure 6-2)

Figure 6-2

A cardboard box is located under the machine body. Retrieve the instruction manual for additional proce- dures of the set up. The box also contains parts re- moved for shipping, spare parts and tools (Figure 6-5).

After cutting out or removing the staples, lift the

 

 

 

 

shipping box in order to clear the machine

 

 

 

 

(two persons required).

 

 

Figure 6-5

 

 

 

 

 

 

6.2 Disposal of Packaging Materials

 

 

 

 

 

 

 

 

 

 

The 700aks package is composed of:

 

 

 

 

 

-

Wooden pallet

 

 

 

 

 

-

Cardboard shipping box

 

 

 

 

 

- Wooden supports

 

 

Figure 6-3

 

-

Metal fixing brackets

 

 

 

 

 

-

PU foam protection

 

 

 

 

 

-

PP plastic straps

 

 

 

 

 

-

Dehydrating salts in bag

 

 

 

 

 

-

Special bag of laminated polyester/aluminium/

Transport the machine with a fork-lift truck to the

 

Polyethylene (sea freight package only)

-

Polyethylene protective material

operating position. Lift the pallet at the point indicat-

ed in Figure 6-3(weight of machine + pallet = See

For the disposal of the above materials, please follow

Specifications).

 

 

 

 

 

the environmental directives or the law in your country.

 

700aks-NA

17

 

 

2011 October

 

 

 

 

Page 29
Image 29
3M 40800 operating instructions Unpacking, Uncrating, Removal of Pallet, Figure, Disposal of Packaging Materials