12-OPERATION
12.1 Operator's Correct Working Position and |
| 12.3 Starting Production |
| |||||||||||
|
| Operational Flow (Figure |
| After having adjusted the machine according to the | ||||||||||
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
| box dimensions | |||||
|
|
|
|
|
|
|
|
| without cartons and check its safety devices. Then | |||||
|
|
|
|
|
|
|
|
| start the working cycle. |
| ||||
|
|
|
|
|
|
|
|
| 12.4 Tape Replacement and Threading |
| ||||
|
|
|
|
|
|
|
|
| Skill 1 - Operator |
| ||||
|
|
|
|
|
|
|
|
| See Manual 2: AccuGlide™ 3 High Speed 3 inch | |||||
|
| Figure |
| Taping Heads. |
| |||||||||
Once the box has been filled, close its top flaps and |
| Press the |
| |||||||||||
push it between the top and bottom drive belts. |
| LATCHING EMERGENCY STOP BUTTON. |
| |||||||||||
Always keep hands in position as shown in |
|
|
|
|
|
| ||||||||
|
|
|
|
|
| |||||||||
Figure |
|
|
|
| WARNING |
| ||||||||
The box will be automatically sealed with adhesive |
|
|
|
|
| |||||||||
|
|
|
|
|
| |||||||||
|
|
|
|
|
| |||||||||
tape on the top and bottom box seams. Then the |
|
| • To reduce the risk associated |
| ||||||||||
box will be expelled on the exit conveyor. |
|
| with sharp blade hazards: |
| ||||||||||
|
|
|
|
|
|
|
|
|
| − Keep hands and fingers away from tape |
| |||
|
|
|
|
|
|
| Hand |
|
|
| ||||
|
|
|
|
|
|
|
|
| cutoff blades under orange blade guards. | |||||
|
|
|
|
|
|
| Position |
|
| The blades are extremely sharp. |
| |||
|
|
|
|
|
|
|
|
| 12.5 Box Size Adjustment |
| ||||
|
|
|
|
|
|
|
|
| Repeat all the operations shown in |
| ||||
|
|
|
|
|
|
|
|
| Section 11 - |
| ||||
|
|
|
|
|
|
|
|
| 12.6 Cleaning |
| ||||
|
|
|
|
|
|
|
|
| Before carrying out any cleaning or maintenance |
| ||||
| Figure |
|
|
|
|
|
| |||||||
|
|
|
|
|
| operation stop the machine by Pushing the OFF (O) | ||||||||
|
|
|
|
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
| switch on the main and disconnect the electric power | |||||
12.2 Starting the Machine | ||||||||||||||
| (Figure |
| ||||||||||||
|
|
|
|
|
|
|
|
|
| |||||
Important: Before starting the machine, verify that |
|
|
|
|
|
| ||||||||
| no tools or other objects are on the conveyor bed. |
| 12.7 Table of Operation Adjustments - |
| ||||||||||
Push the main switch ON (I) after the EMERGENCY |
|
| ||||||||||||
|
| Operator Qualifications |
| |||||||||||
BUTTON is released (Figure |
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
| 1 | Tape loading and threading | 1 | ||||
|
|
|
|
|
|
|
| |||||||
|
|
|
|
|
|
|
| 2 | Tape web alignment | 1 | ||||
|
|
|
|
|
|
|
| 3 | Adjustment of one way tension roller | 1 | ||||
|
|
|
|
|
|
|
| 4 | Adjustment to box size (H and W) | 1 | ||||
|
|
|
|
|
|
|
| 5 | Top flap compression rollers | 1 | ||||
|
|
|
|
|
|
|
| 6 | Adjustment of tape applying spring | 1 | ||||
|
|
|
|
|
|
|
| 7 | Conveyor bed height adjustment | 1 | ||||
|
|
|
|
|
|
|
| 8 | Special | 2 | ||||
|
|
|
|
|
|
|
| 9 | Special | 2 | ||||
|
|
|
|
|
|
|
|
| 12.8 Safety Devices Inspection |
| ||||
|
|
|
|
|
|
|
| 1 | Taping units blade guard |
| ||||
|
|
|
|
|
|
|
| 2 | Latching emergency stop button |
| ||||
|
|
|
|
|
|
| 3 | STOP (OFF) (O) main switch |
| |||||
|
| Figure |
| |||||||||||
|
|
|
|
|
|
|
|
| 2011 October |
| ||||
| 27 |
|
|
|
| |||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|