3M 40800 operating instructions Figure, 4– Tape Loading/Threading, 5– Tape Loading/Threading

Models: 40800

1 126
Download 126 pages 4.35 Kb
Page 97
Image 97
Figure 3-4 – Tape Loading/Threading

Operation (continued)

Figure 3-4

Place tape roll on tape drum to dispense tape with adhesive side forward. Seat tape roll fully against back flange of drum. Adhere tape lead end to threading needle as shown.

Figure 3-5 – Tape Loading/Threading WARNING

To reduce the risk associated with sharp blade hazards:

Keep hands and fingers away from tape cutoff blades under orange blade guards. The blades are extremely sharp

Manually turn tape roll to create slack tape while pulling threading needle through tape applying mechanism until needle is through and tape is in alignment with applying roller.

Excess tape can be cut with a scissors at applying roller.

Figure 3-4 – Tape Loading/Threading

Figure 3-5 – Tape Loading/Threading

AccuGlide 3 - 3" - NA

11

2012 January

Page 97
Image 97
3M 40800 operating instructions Figure, 4– Tape Loading/Threading, 5– Tape Loading/Threading