30.Attach the control assembly's support tube to the welded bracket below the discharge chute using (2) 5/16" x
31.Tighten bolts assembled in steps 29 and 30.
SECURE CABLES HERE
NYLON TIE
CHUTE TILT CONTROL
BOWED
WASHER
5/16" x
CARRIAGE BOLT
5/16" NYLOCK
NUT
5/16" NYLOCK NUTS | 5/16" x | |
CARRIAGE BOLTS | ||
| ||
| figure 23 |
38.Insert the wire harness into the large hole at the front of the control box.
39.Connect the wire harness to the switch.
40.Using nylon ties, secure the wire harness and clutch cable to the handle assembly to keep them from interfering with moving parts.
32. Cut the nylon tie that holds the two chute crank brackets together.
33. Attach the chute crank brackets to the discharge housing using (2) 5/16" x 1" carriage bolts, 5/16" washers and 5/16" nylock nuts. Do not tighten yet.
34. Adjust position of chute crank brackets so that spiral does not rub bottom of discharge chute notches.
35. Tighten bolts and nuts assembled in step 33.
NOTE: Spiral not shown for clarity. | figure 26 | |
| ||
5/16" x 1" |
| |
CARRIAGE BOLT | 41. Roll the ATV up behind the snow thrower, keeping the | |
| ||
| push channel centered between the stabilizer brackets. | |
| Make sure the guide bracket will slide in between | |
| the stabilizer brackets as shown in figure 27. Keep a | |
| minimum clearance of | |
| ATV and the snow thrower. | |
5/16" WASHER | NOTE: ATV not shown below for clarity. | |
5/16" NYLOCK | STABILIZER BRACKETS | |
NUT | ||
| ||
| GUIDE BRACKET | |
figure 24 |
| |
36. Attach the chute tilt control to the control assembly |
| |
using (2) 5/16" x |
| |
washers and (2) 5/16" nylock nuts. |
| |
37. Using a nylon tie, secure the cables from the chute tilt |
| |
control to the support tube as shown in figure 25. |
| |
Note: Do not secure the chute tilt control cables in locations | figure 27 | |
other than the one shown. |
11