![](/images/backgrounds/235104/235104-4338x1.png)
Specifications and Dimensions
|
| Connecting External Liquid Supplies to the |
DESIGN 7 AND LATER | 1 |
1. Remove knockout from supply dispenser. Refer
2
to Figure 19. Plugs are assembled inside the
3
tubing ring.
2. Install PG connector in hole with strain reliefs,
4
included in the seal nut.
53. Insert tubes through PG base. Do not remove cups. Tube should extend into the plastic cup, with the exception of the softener tube, which should be routed to the outside of the cup.
| 6 |
| 4. Tighten the seal nut to prevent tubing from | |
|
|
| escaping the assembly. |
|
|
|
| 5. Before operating machine, confirm lid is | |
|
|
| completely closed. |
|
|
|
| Do not attempt to make chemical injection electrical | |
|
|
| connections to points other than those provided | |
|
|
| specifically for that purpose by the factory. |
|
|
|
| Chemical Injection Supply System | |
|
| PHM559N | Number of dry supply compartments | 5 |
|
|
|
| |
1 | Tubing from Pump |
| Number of liquid supply connections | 5 |
|
|
|
2Seal Nut
3 | Tubing Ring | Liquid supply connection size, in | 0.63 (15.9) |
4 | Base | (mm) |
|
5Lid
6Nut
Figure 19
36 | © Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT | F232084 |