Specifications and Dimensions

 

 

Connecting External Liquid Supplies to the

DESIGN 7 AND LATER

1

Washer-Extractor

1. Remove knockout from supply dispenser. Refer

2

to Figure 19. Plugs are assembled inside the

3

tubing ring.

2. Install PG connector in hole with strain reliefs,

4

included in the seal nut.

53. Insert tubes through PG base. Do not remove cups. Tube should extend into the plastic cup, with the exception of the softener tube, which should be routed to the outside of the cup.

 

6

 

4. Tighten the seal nut to prevent tubing from

 

 

 

escaping the assembly.

 

 

 

 

5. Before operating machine, confirm lid is

 

 

 

completely closed.

 

 

 

 

Do not attempt to make chemical injection electrical

 

 

 

connections to points other than those provided

 

 

 

specifically for that purpose by the factory.

 

 

 

 

Chemical Injection Supply System

 

 

PHM559N

Number of dry supply compartments

5

 

 

 

 

1

Tubing from Pump

 

Number of liquid supply connections

5

 

 

 

2Seal Nut

3

Tubing Ring

Liquid supply connection size, in

0.63 (15.9)

4

Base

(mm)

 

5Lid

6Nut

Figure 19

36

© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT

F232084