Designs 1-4
1
2 3
4
5
6
P041I
P041I
1Tubing from Pump
2Seal Nut
3Tubing Ring
4Base
5Lid
6Nut
Figure 21
Specifications and Dimensions
Connecting External Liquid Supplies to the
1.Remove plugs from base. Refer to Figure 21. Plugs are assembled inside the tubing ring.
2.Install strain reliefs, included in the seal nut.
3.Insert tubes through base. Do not remove cups. Tube should extend into the plastic cup, with the exception of the softener tube, which should be routed to the outside of the cup.
4.Tighten the seal nut to prevent tubing from escaping the assembly.
5.Before operating machine, confirm lid is completely closed.
Do not attempt to make chemical injection electrical connections to points other than those provided specifically for that purpose by the factory.
Chemical Injection Supply System
Number of dry supply compartments | 5 |
|
|
Number of liquid supply connections | 5 |
|
|
Liquid supply connection size, | 0.63 (15.9) |
in (mm) |
|
|
|
F232084 | © Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT | 39 |