Chapter 2: Installation

Site Requirements

Unpacking

The device should be placed on a table-top. Before installing the unit, verify that the location chosen for installation meets the following site requirements.

ˆGeneral — Ensure that the power supply is correctly installed.

ˆPower — The unit is installed within 1.5 m (5 feet) of a grounded, easily accessible outlet 100-250V AC, 50-60Hz.

ˆClearance — There is adequate frontal clearance for operator access. Allow clearance for cabling, power connections, and ventilation.

ˆCabling — The cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast amplifiers, power lines, and fluorescent lighting fixtures.

ˆAmbient Requirements — The ambient unit operating temperature range is 0 to 40ºC (32 to 104ºF) at a relative humidity of up to 95%, non-condensing. Verify that water or moisture cannot enter the device casing.

This section contains information for unpacking the device, and includes the following topics:

ˆ“Package Contents” on page 30

ˆ“Warranty” on page 30

ˆ“Unpacking Essentials” on page 30

Package Contents

While unpacking the device, ensure that the following items are included:

ˆOne AT- AT-8000/xx series unit

ˆRubber Feet for desktop installation

ˆRack-mount kit hardware accessories

ˆAn AC power cable

ˆStacking cable (Yellow color)

ˆConsole RS-232 cable with RJ-45 connector

ˆInstallation guide on CD

Warranty

The AT-AT-8000 series switches have a Lifetime Warranty (two years for Fan and PSU). Go to www.alliedtelesis.com/warranty for the specific terms and conditions of the warranty and for warranty registration.

Unpacking Essentials

Note

Before unpacking the device, inspect the package and report any evidence of damage immediately.

30

Page 30
Image 30
Allied Telesis AT-8000GS/24, AT-8000GS/POE manual Site Requirements Unpacking, Package Contents