x600 Layer 3 Gigabit Ethernet Switch Installation Guide

3.Position the transceiver with the label facing up.

4.Slide the transceiver into the slot until it clicks into place.

23R

CLASS

LASER PR 1

ODUCT

24R

21 22 23 24

L/A D/C

1000

LINK

FDX

 

/

PORT AC ACT

1331

Figure 23. Installing an SFP Transceiver

5.For the x600-24Ts and x600-24Ts/XP switches, verify that the handle on the SFP transceiver is in the upright position, as shown in Figure 24, to prevent inadvertently removing the transceiver.

23R

 

 

 

 

 

 

CLASS 1

 

 

 

 

 

LASER

PRODUCT

 

 

 

 

 

 

 

 

 

 

 

 

SFP

L/A

1000

LINK /

PORT

AC

 

D/C

 

 

FDX

ACT

24R

 

 

 

 

 

 

 

 

 

21

 

 

 

 

 

 

22

 

 

 

 

 

 

23

 

 

 

 

 

 

 

24

 

 

 

 

 

 

1331

 

 

 

 

SFP Handle

 

 

 

 

 

Figure 24. Positioning Handles on the x600-24Ts and x600-24Ts/XP

Switches

47

Page 47
Image 47
Allied Telesis X600-48TS/XP, x600-48Ts, x600-24Ts/XP, X600-24TS manual SFP Handle