Amana ACO1520A important safety instructions Installation, Parts, Tools, Materials, Clear tape

Models: ACO1520A

1 46
Download 46 pages 14.34 Kb
Page 10
Image 10
Clear tape

INSTALLATION

PARTS, TOOLS, MATERIALS

YOU WILL NEED THE FOLLOWING TOOLS AND MATERIALS FOR THE INSTALLATION:

Carton or other heavy material for covering the counter top.

Clear tape

 

Stud finder or thin nail.

(for taping the templates to the wall)

 

 

 

 

 

Keyhole saw (for the power cord hole)

Saber saw (for cutting vent holes for roof or wall venting)

Electric drill

Phillips screwdriver (for the screws)

 

3/8" and 3/4" wood drill bits

 

 

1/2" and 3/16"

Pencil

drill bits

 

 

 

Flat blade screwdriver (for the toggle bolts)

Plumb line

Measuring tape (metal preferred)

Duct Tape

Small side cutters or tin snips

Caulking gun

If you have brick or masonry walls, you will need special hardware and tools.

The ductwork you need for the installation is not included. All wall and roof caps must have a back-draft damper.

10

Page 10
Image 10
Amana ACO1520A important safety instructions Installation, Parts, Tools, Materials, Clear tape