AMCC 9550SX-8LP manual Shows the BBU fully installed on 3ware controllers

Models: 9550SX-8LP

1 40
Download 40 pages 19.67 Kb
Page 34
Image 34

Chapter 2. Installing the Battery Backup Unit

bPress down gently on the battery module until the bottom clip snaps into place in the lower hole.

3Insert the battery power connector into the power receptacle on the BBU.

Note: The battery will drain if it is plugged in and there is no power to the unit. If the system will not be used right away, wait to do this step until the system is ready for use.

Figure 29. Battery power connector inserted in power receptacle

The controller is now ready to install in your system.

Figure 23 shows the BBU fully installed on 3ware controllers.

303ware 9550SX Serial ATA RAID Controller Quick Install Guide

Page 34
Image 34
AMCC 9550SX-8LP manual Shows the BBU fully installed on 3ware controllers