
To Replace Main Door Hinge Blocks
1.Discontinue electrical power to the dryer.
2.Follow procedure for removal of main door assembly.
3.Disassemble bottom hinge block from front panel by removing the Allen head screws located inside the hinge block.
4.Reassemble by reversing removal procedure.
5.Reestablish electrical power to the dryer.
F. PULLEYS
To Replace Tumbler (Basket) Pulley
1. Loosen
2. Remove cap screws from the bushings.
3. Insert cap screws in tapped removal holes and tighten evenly until bushing becomes loose on shaft. Refer to figure “A.”
4. Remove bushing, pulley, and key.
5. Assemble bushing and sheave as shown in figure “B” on page 26. When cap screws are loosely inserted, bushing remains fully expanded to provide a sliding fit on the shaft.
6.Insert key on the shaft, then slide sheave to desired position with cap screw heads to the outside.
7. Tighten cap screws progressively. There should remain a gap between the sheave hub and the flange of the bushing.
IMPORTANT: Tighten screws evenly and progressively. Never allow the sheave to be drawn in contact with the flange of the bushing. This gap should measure from 1/8” to 1/4”.
Proper cap screw torque is 30
25