c. Reassemble The Tumbler (Basket) Section To The Tumbler (Basket) Base

Lift the tumbler (basket) section with a cable through the eye bolts on top of the section. Slowly lower the tumbler (basket) section over the tumbler base. The four (4) large slots located on the bottom of the tumbler (basket) section (one slot at each corner of the tumbler section) must be aligned with the tapped holes in the cylinder cleaves located at the top of the tumbler (basket) section. Use the four (4) 1-1/4-12 x 3-1/2’ long bolts supplied with the unit to secure the tumbler (basket) section to the tumbler (basket) base section.

d. Reattach The Control Pendant Arm

Position the control pendant arm on the top front of the heat console section by aligning the clearance holes in the arm over the 1/4-20 taped holes in the top of the heat console section. Use the 1/4-20 x 3” long bolts supplied with the unit to attach the arm to the console.

e.Reconnect The Internal Air, Electric Connections, and Water Connections (refer to page 12 through page 19).

10

Page 14
Image 14
American Dryer Corp MLG-460 manual