If no, check associated:

Switch and Wiring

Check wiring back to the Base Electrical Junction Box

Check PLC (Programmable Logic Controller)

Refer to Wiring Diagrams:

Main Electrical Panel Diagram

Base Electrical Junction Box Wiring Diagram.

•Retest; verify that the signal is operational.

3b) Place the dryer in the UNLOAD position; TILTED FORWARD

Actuate the Rear Down switch by hand.

Have someone verify that PLC (Programmable Logic Controller) input L.E.D. (light emitting diode) #12 lights when the switch actuator is down, and is OFF when the actuator is up.

Does L.E.D. (light emitting diode) #12 come “ON” when the switch is down?

If yes, wiring is OK.

Check switch, actuator placement and tilt actuation.

NOTE: If actuator is at a 90° or greater angle with the base, the actuator will damage if machine is lowered.

If no, check associated:

Switch and Wiring.

Check wiring back to the Base Electrical Junction Box.

Check PLC (Programmable Logic Controller).

Refer to Wiring Diagrams:

Main Electrical Panel Diagram

Base Electrical Junction Box Wiring Diagram.

Retest; verify that the signal is operational.

84

Page 88
Image 88
American Dryer Corp MLG-460 manual