5.Remove the tumbler and support through the front of the dryer.
A.Remove the bolt in the center of the tumbler back wall.
B.Loosen and remove the nuts and washers from the tumbler tie rods. Remove the rods.
C.Replace either tumbler or tumbler support by reversing the procedure.
6.Reassemble components into dryer by reversing steps 1 through 4.
7.Check tumbler lateral and vertical alignment. Also, check belt tension and alignment.
8.Replace backguard and
I. V-Belts (refer to illustration in Sections I, J and K)
V-Belt Tension Adjustment-Tumbler To Idler
1. Loosen two (2) bolts connecting to
2. Back off jam nut on the adjustment bolt.
3. Tighten belts by turning adjustment bolt clockwise. (turn counterclockwise to loosen belts)
4. Tighten both bolts connecting to back up plate.
5. Check vertical plane of idler pulley for parallel alignment with tumbler pulley.
6. If realignment is required, loosen tumbler pulley and move tumbler pulley to proper position.
7.
V-Belt Tension Alignment - Motor To Idler
1. Loosen two (2) bolts connecting idler arm to
2.
3. Loosen/tighten adjustment bolt to relax/increase belt tension.
4. Tighten adjustment bolt jam nuts(s).
5. Tighten the two (2) bolts loosened in step 1.
36