Electrical Installation: Bypass Static Switch Wiring
Bottom cable entry
Top view of bottom cable entry
UPS Summary |
|
~ | ~ |
Top view of AC IN & OUT bottom cable connections
L1 IN | L1 OUT | L2 IN | L2 OUT | L3 IN | L3 OUT |
Communication cable Port ![]()
L1 IN
L1 OUT
L2 IN
L2 OUT
L3 IN
L3 OUT
![]()
![]()
![]()
![]()
![]()
![]()
PE |
| |
1.75 in / | 1.75 in / | |
44.45 mm | ||
44.45 mm | ||
| ||
| 2.3 in / 58 mm |
Loosen the 8 bolts to remove bottom cover.
No drilling or cutting should take place inside the UPS.
Note
Drill holes for conduits.
Feed cables through conduits. Connect cables at cable connection points as illustrated.
Connect grounding electrode conductor to busbar locations as shown.