Electrical Specification
Installation Planning Data
Service (480V
Maintenance Bypass Panel
Q3
External Bypass SSW | Q6 |
Q5 | Optional |
|
| Q4 | |
| Optional | |
| UPS | |
Q1 | Q2 | |
Optional | ||
|
Battery | Q7 | Q8 | Battery |
Breaker 1 |
|
| Breaker 2 |
Output (480V
The installation is a typical installation including ancillary equipment, which is available from APC.
Note
UPS and External Bypass Static Switch feed must be generated from synchronized sources.
Note
WARNING!
Supply the UPS from a dedicated, grounded
WARNING!
The UPS has no internal manual disconnect devices to switch off external AC (Q1 and Q5) and DC (Q7 and Q8) input power. Ensure that disconnection devices are available as separate components for this installation.
CAUTION!
Ensure clockwise phase rotation (L1, L2, L3) of input voltages.
Symmetra MW 1000 kW 480 V Installation - | 29 |