Safety: IMPORTANT SAFETY INSTRUCTIONS - SAVE THESE INSTRUCTIONS

Installation safety

EPO

Note

Press the EPO (Emergency Power Off) button to switch off all AC and DC power supply to connected equipment in the room. The EPO is typically located on a wall in the room in which the UPS is installed. See “Communication cable overview” section for information on how to wire the UPS to the EPO.

WARNING!

Before starting installation, check and test that all AC and DC power source breakers are in open position.

WARNING!

Only personnel trained in the construction and operation of the equipment, and the electrical and mechanical hazards involved, may install or remove system components.

CAUTION!

Do not use High Voltage Testing Equipment. This equipement will destroy the electronic circuits in the unit.

CAUTION!

The system is equipped with an optional auto-start function, enabling the system to start without any warning when power is applied.

CAUTION!

All wiring must be in accordance with applicable national and/or local electrical codes.

This unit contains components that are sensitive to electrostatic discharge (ESD). Follow proper ESD procedures to avoid severe damage to electronic components.

This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the Installation Manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference, in which case the user will be required to correct the interference at his own expense.

2

Symmetra MW 1000 kW 480 V Installation - 990-4112E

Page 6
Image 6
American Power Conversion MW manual Epo, Installation safety