Top Cable Entry

Preparing for top cable entry (default)

Cable entry in top cover of Input/Output Section.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Top view

 

M6 Bolt

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Battery

 

Battery

 

 

 

 

 

 

 

cable

 

cable

 

 

 

 

 

 

 

entry

 

entry

 

 

 

 

 

 

AC IN cable

 

AC OUT

 

 

 

 

 

entry

 

cable entry

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

BAT 1 BAT 2

Top view

AC IN

AC OUT

90

L3 IN

95

L3 OUT

91

L2 IN

94

L2 OUT

92

L1 IN

93

L1 OUT

1.75 in /

1.75 in /

44.45 mm

44.45 mm

 

 

2.3 in / 58 mm

IN/OUT power cable (top entry)

L1 IN

L1 OUT

92

93

L2 IN

L2 OUT

91

94

L3 IN

L3 OUT

90

95

Loosen the 8 bolts in cable entry covers. Drill holes for conduits in areas shown. Re-fit the covers and install the conduits.

Install cable lugs on busbars. Use M12 bolts.

Symmetra MW 1000 kW 480 V Installation - 990-4112E

9

Page 13
Image 13
American Power Conversion MW manual Top Cable Entry, Preparing for top cable entry default