Top view of Input/Output Section
  | 
  | 
  | 
  | 
  | 
  | Battery | 
  | Battery  | 
  | 
  | cable | 
  | cable  | 
  | 
  | entry | 
  | entry  | 
  | 
  | 
  | 
  | 
  | 
  | 
AC IN cable  | 
  | AC OUT  | ||
entry  | 
  | cable entry  | ||
  | 
  | 
  | 
  | 
  | 
Electrical Installation: Top Cable Entry
1.75 in /  | 1.75 in /  | |
44.45 mm  | ||
44.45 mm  | ||
  | ||
  | 2.3 in / 58 mm  | 
IN/OUT power cable (top entry)
Battery 1 Battery 2 
(BAT 1 
BAT 1-  | BAT 2+  | 
BAT 1-  | BAT 2+  | ||
L1  | In  | L1  | Out  | 
L2  | In  | L2  | Out  | 
L3  | In  | L3  | Out  | 
  | 
  | 
  |   | 
  | BAT 1+  | 
  | 
  | 
  | 
  | BAT 2-  | 
  | 
BAT 1+
BAT 2-
Front view of Input/Output Section
Feed the battery cables through the top of Input/Output Section.
Connect cables from battery system as illustrated.
Connect cables from battery system as illustrated.
Symmetra MW 1000 kW 480 V Installation -   | 11  |