Bottom Cable Entry
Preparing for bottom cable entry
Cable entry in bottom cover of Input/Output Section
Top view
|
|
|
|
|
| Battery |
| Battery |
|
| cable |
| cable |
|
| entry |
| entry |
|
AC IN |
| AC OUT | ||
cable entry |
| cable entry | ||
|
|
|
|
|
M6 Bolt
1.75 in / | 1.75 in / | |
44.45 mm | ||
44.45 mm | ||
| ||
| 2.3 in / 58 mm |
Top view
BAT 1 | BAT 2 |
Front view
M14
M14
M10
M10
M10
AC IN | AC OUT |
90 | L3 IN | 95 | L3 OUT |
| L2 IN | M10 | L2 OUT |
|
|
92 L1 IN | 93 L1 OUT |
M14
M14
M10
M10
M10
L1 IN | 90 |
|
95
L1 OUT
| BAT 1 | BAT 2 | |
| Top view |
|
|
AC IN | AC OUT | ||
90 | L3 IN | 95 | L3 OUT |
| L2 IN |
| L2 OUT |
92 | L1 IN | 93 | L1 OUT |
L2 IN
L3 IN
91
92
94
93
L2 OUT
L3 OUT
IN/OUT power cable (bottom entry).
Symmetra MW 1000 kW 480 V Installation - | 13 |