Input wiring options

Input wiring overview: Refer to the diagrams on the following pages for input wiring options.

Main Input Power Single and Three Phase

Bypass Input Power Single and Three Phase

Main Phase 1

Main Phase 2

Main Phase 3

Neutral

Ground

Bypass Phase 1

Bypass Phase 2

Bypass Phase 3

GND NEU

L3

L2

L1

B1

B2

B3

 

 

MSJ

 

BSJ

 

 

 

SJ1

 

 

 

 

 

 

 

 

SJ2

 

 

 

 

 

 

 

SJ3

Labeled jumpers must be installed in the appropriate locations.

I

Input/Output Jumper Configurations

 

 

Input

 

 

Output

 

 

 

 

Jumpers

 

 

Jumpers

Power I/O

Separate

 

 

 

 

 

 

Configuration

SJ1

SJ2

SJ3

MSJ

BSJ

OSJ

Bypass Feed

Input:Output

 

 

 

 

 

 

 

 

 

 

 

 

 

1:1**

No

 

*

*

 

 

 

1:1

Yes

 

 

 

 

 

 

3:1

No

 

 

 

 

 

 

3:1

Yes

 

 

 

 

 

 

3:3

No

 

 

 

 

 

 

3:3

Yes

 

 

 

 

 

 

* Optional

 

 

 

 

 

 

 

** Factory Default

 

 

 

 

 

 

 

Smart-UPS RT 15000/20000 VA 230 Vac UXI/UXICH Tower User Manual

9

Page 13
Image 13
American Power Conversion 20000 VA, SURT15000 user manual Input wiring options, Input/Output Jumper Configurations