Installation

 

Tower front panel

 

 

Interface Display

PowerView

Ethernet Port 10/100 Base-T

RJ45 Connector (pass through

 

to Rear Panel RJ45 Connector

SmartSlot with Network

 

Serial Port

Management Card

 

PowerView Cable Connector

Cold Start/EPO reset

Install PowerView

Prior to attaching the PowerView to the UPS:

1.Loosen the two bracket screws on the back of the PowerView module.

a.Slide the bracket to the position that will accommodate the screw holes on the UPS.

b.Tighten the screws on the bracket.

2.Secure the PowerView to the UPS using the two thumb screws attached to the PowerView.

Smart-UPS RT 15000/20000 VA 230 Vac UXI/UXICH Tower User Manual

3

Page 7
Image 7
American Power Conversion 20000 VA, SURT15000 user manual Installation, Install PowerView