Start-Up

Connect load to UPS

1.The UPS features chassis ground connection screws located on the rear panel, for connecting the ground leads on transient voltage devices.

Prior to connecting the grounding cable, ensure that the UPS is NOT connected to utility or battery power.

2.Connect equipment to the UPS.

NOTE: This UPS is equipped with an external battery connector on the rear panel of the unit.

The battery charges to 90% capacity during the first three hours of normal operation. Do not expect full battery run capability during this initial charge period.

Refer to the APC Web site, www.apc.com for battery runtimes.

Where appropriate use an APC extension battery cable. For ordering details contact your dealer or APC through the Web site www.apc.com.

3.Add optional accessories to the SmartSlot located on the rear panel.

For optimal computer system security, install PowerChute Smart-UPS monitoring software.

Connect power to UPS and load

1.Connect input power to the UPS.

2.Check the PowerView interface display for messages.

3.Turn on the load using the interface display menu options.

Bypass mode

Turn Load On

Communication Ports

SERIAL PORT Use only the supplied cable to connect to the serial port. A standard serial interface cable is incompatible with the UPS.

The serial port can be used to configure tht Network Managegment Card.

20

Smart-UPS RT 15000/20000 VA 230 Vac UXI/UXICH Tower User Manual

Page 24
Image 24
American Power Conversion SURT15000, 20000 VA Connect load to UPS, Connect power to UPS and load, Communication Ports