COMMERCIAL GAS WATER HEATER
SERVICE MANUAL
TABLE OF CONTENTS
INTRODUCTION | 3 |
Qualifications | 3 |
Service Warning | 3 |
Service Reminder | 3 |
REQUIREMENTS | 4 |
Instruction Manual | 4 |
Tools Required | 4 |
Tools Optional | 4 |
INSTALLATION CONSIDERATIONS | 5 |
Water Piping | 5 |
Closed Water Systems | 5 |
Thermal Expansion | 5 |
Gas Pressure Requirements | 5 |
Air Requirements | 6 |
Air Supply | 6 |
Insufficient | |
and Downdrafts | 7 |
| |
doors | 8 |
Contaminated Air | 9 |
Clearances (Water Heater) | 9 |
Clearances (Exterior) | 10 |
Venting | 11 |
OPERATION AND SERVICE | 12 |
Sequence of Operation | 12 |
Electrical Sequence | 13 |
Wiring Diagram | 14 |
Operating Sequence - Flow Chart | 15 |
Gas Control Valve | 16 |
Measuring Gas Pressures | 16 |
Manifold Pressure Adjustment | 17 |
Main Valve Solenoid Connections | 17 |
Gas Control Valve/Burner Area View | 18 | |
Blower Prover Switch - Settings | 19 | |
Thermostat and Ignition control Board View | 20 | |
White Rodgers Integrated Control - Thermostat | 21 | |
White Rodgers Ignition Control Board | 21 | |
22 | ||
TROUBLESHOOTING | 23 | |
Ignition Control Board: Error Codes | 23 | |
1 | Flash | 23 |
2 | Flashes | 23 |
3 | Flashes | 24 |
4 | Flashes | 24 |
6 | Flashes | 24 |
7 | Flashes | 24 |
8 | Flashes | 25 |
Continuous Flash | 25 | |
Continuous On | 25 | |
Integrated Heater Control: Display Lights | 26 | |
Test 1: 120 VAC to Heater Check | 27 | |
Test 2: Polarity Check | 28 | |
Test 3: Continuity Check of High Limit (ECO) | 29 | |
Test 4: Upper Temperature Probe |
| |
Continuity Check | 30 | |
Test 5: Calling for Heat - No Blower Operation | 31 | |
Test 6: Blower On, No Ignition | 32 | |
Test 7: Blower On, Blower Prover Switch Closed, |
| |
No Igniter Operation | 33 | |
Test 8: Igniter Heats, No Main Burner | 34 | |
Test 9: Igniter Heats, No Main Burner | 35 | |
Test 10: Main Burner Ignition for Less than |
| |
Five Seconds | 36 | |
Test 11: Water Heater Shutting Off Below Setting .. | 37 |
Servicing should only be performed by a Qualified Service Agent
2