Secure the terminal block and label to the UPS with two screws (supplied), as shown in the diagram.
su0671a
Refer to the diagram below. Use the screws supplied. Connect the ground wires with the grounding screws. Connect the input and output cables.
su0672a
Primary |
Ground |
Green Wire |
Input Line1 |
Hot |
Ground |
Input Line2 or Neutral
Output Line1 | Output Line2 |
or Neutral |
Hardwire Kit SMT2200/3000 VA 100/120/230 VAC Tower | 3 |