APW Wyott M Series manual M-83 Only, M-83/M-83D, M-95, Assembly Refer To Illustrations Above, M-91

Models: AT/BT Series M Series

1 20
Download 20 pages 40.26 Kb
Page 4
Image 4
2.ASSEMBLY (REFER TO ILLUSTRATIONS ABOVE)

4A

4A

 

2

6A

3

3

3

5

 

 

6B

5

2

 

1

1

2

 

1

4B

 

 

5

2.ASSEMBLY (REFER TO ILLUSTRATIONS ABOVE)

a)Lay the toaster on its side and install the four Adjustable Legs (Item 1) in threaded holes in base. Tighten legs with crescent wrench. The unit may be leveled by unscrewing the lower insert of each leg. Precise leveling is not required for proper operation of the toaster. Set the toaster upright.

CAUTION: DO NOT OPERATE THE TOASTER WITHOUT THE LEGS INSTALLED.

3.CONVEYOR INSTALLATION

M-83 Only:

Remove Butter Roller (Item 2) by pushing shaft to the left to disengage. Remove Butter Pan (Item 3) by lifting the pan up and off the supporting pins.

M-83/M-83D:

a)Remove Top Front Panel (Item 4A) by gripping the two black knobs while lifting up and slightly back. The Bottom Front Panel (Item 4B) can then be removed by grasping the top edge with one hand and pulling straight back. Hold the bottom with the other hand and lift up and toward the front; then slide panel down and out underneath the Butter Roller bushings.

b)Grasp Conveyor (Item 5) by the handles. Lower conveyor knobs into right and left Hangar Brackets (Item 6A/B). Gently push forward to engage gears.

CAUTION: THE CONVEYOR IS HEAVY. DO NOT DROP INTO POSITION. DROPPING MAY CAUSE DAMAGE TO GEARS.

c)Replace Bottom Front Panel (Item 4B), Top Front Panel (Item 4A), Butter Pan (Item :3) and Butter Roller (Item 2)

M-91 :

a)The Conveyor (Item 5) is shipped in place and strapped down with nylon tie. To remove

nylon tie, follow steps b, c and d.

.

b)Remove Butter Roller (Item 2) by pushing shaft to the right to disengage. Remove Butter Pan (Item 3) by sliding toward the front of the unit, underneath the Butter Roller Bushings.

c)Remove Front Panel (Item 4) by gripping the top edge with one hand and the bottom edge with the other hand. Lift up to disengage slots in panel from retaining rods, then move forward and slide down and out underneath the Butter Roller Bushings.

d)Cut and remove the nylon tie securing the conveyor. (Note: To remove for cleaning, see "Disassembly" Instructions.)

e)Replace Front Panel (Item 4), Butter Pan (Item 3) and Butter Roller (Item 2).

M-95

a)The Conveyor (Item 5) is shipped in place and strapped down with nylon tie. To remove nylon tie, follow steps b, c, and d.

b)Remove Butter Roller (Item 2) by lifting left side of butter roller shaft. Remove Butter Pan by sliding toward the front of the unit, underneath the butter roller bushings.

4

Page 4
Image 4
APW Wyott M Series, AT/BT Series manual M-83 Only, M-83/M-83D, M-95, Assembly Refer To Illustrations Above, M-91