Manuals
/
Brands
/
Computer Equipment
/
Tablet
/
Argee
/
Computer Equipment
/
Tablet
Argee
MSA-004-004
- page 17
1
17
59
59
Download
59 pages, 3.63 Mb
8
e
6 T
hreaT
a
nalysis
r
eporTer
Q
uick
s
TarT
G
uide
13
6.
Slide the inner rails which are attached to the chassis into the outer rails on the rack.
Contents
Main
GUIDE
8e6 enterprise Filter Quick start Guide
C
threat analysis reporter introduCtion ....................................................1
regulatory speCifiCations and disClaimers .............................................49
appendix: optional ethernet tap installation ........................................ 51
Page
threat analysis reporter introduCtion
About this Document
Conventions Used in this Document
serviCe information
8e6 Corporate Headquarters (USA)
8e6 Taiwan
Procedures
preliminary setup proCedures
Unpack the Unit from the Carton
Select a Site for the Server
Rack Mount the Server
Rack Setup Precautions
Rack Mount Instructions
Optional: Install the Chassis Rails
Page
Optional: Install the Traditional UP Racks
Page
Optional: Install the Open Racks
Page
Page
Install the Chassis into the Rack
Check the Power Supply
Power Supply Precautions
General Safety Information
Server Operation and Maintenance Precautions
AC Power Cord and Cable Precautions
Electrical Safety Precautions
Motherboard Battery Precautions
Caution:
install the server
Step 1: Initial Setup Procedures
Step-by-Step Setup Requirements
Step 1A: Step-by-Step Setup Procedures
Link the Workstation to the Threat Analysis Reporter
Serial Console Setup
HyperTerminal Setup Procedures
Page
Page
Step-by-Step Initial Setup Procedures
Login screen, password prompts
Page
Congure Network Interface screen
Page
Page
Congure Host Name screen
Time zone regional conguration screen
Congure Wizard user screen
Setup Wizard Conrmation screen
Administration menu
System Status Screen
Log Off, Disconnect the Peripherals
Physically Connect the Unit to the Network
Bandwidth Management
Step 2: Wizard Setup Procedures
Access the Threat Analysis Reporter Administrator Console
Log in to the Threat Analysis Reporter Administrator Console
Step 1: Register administrator
Page
Page
Step 2: Register R3000 & ER
R3000:
Page
Page
ER:
Step 3: Register Gauges
Specify Gauge Groups to be Monitored
View, Edit Gauge Components
Step 4: Server Settings
C
led i ndiCators and B
MSA Units
Front LED Indicators and Buttons for Hardware Status Monitoring
LED Indicator Key Button Key
LED Indicator Color Condition Description
regulatory speCifiCations and disClaimers
Declaration of the Manufacturer or Importer
Industry Canada Equipment Standard for Digital Equipment (ICES-003)
Safety Compliance
Electromagnetic Compatibility (EMC)
EC Declaration of Conformity
European Community Directives Requirement (CE) Declaration of Conformity
appendix: optional ethernet tap installation
Preliminary Setup Procedures
Unpack the Ethernet Tap Unit from the Box
Other Required Installation Items
Install the Ethernet Tap Unit
Page
i