Installation

Before you Begin

1.Make sure that power to all the devices you will be connecting up have been turned off.

2.To prevent damage to your equipment due to ground potential difference, make sure that all devices on the installation are properly grounded. Consult your dealer for technical details, if necessary.

Single Station Installation

In a Single Stage installation, there are no additional Master View’s daisy chained down from the first unit. To set up a single stage installation do the following:

1.Use connector cable sets (as described in the Cables section on p. 3), to connect any available CPU Port to the Keyboard, Video and Mouse ports of the computer you are installing.

Note: Ignore the Daisy Chain Port at this time. It is only used when daisy chaining additional Master View units. Daisy chaining is described in the next section.

2.Plug the power adapter cable into the Master View’s Power Jack, then plug the power adapter into an AC power source.

3.Turn on the power to the computers.

ACS-1208L / ACS-1216L User Manual

7

2002-01-15

Page 11
Image 11
ATEN Technology ACS-1208L user manual Before you Begin, Single Station Installation