16 | Installation (for qualified installers only) |
Vent Installation
•Slide the vent sections together and turn 1/4 turn until the sections lock in place.
• Screws are not required to secure the vent. However, three screws may be used to secure vent sections together if desired.
•High temperature sealant is recommended at the appliance starter section connection (use
• If disassembly is required, at time of
•Horizontal sections require a 1/4" rise every 12" of travel
•Horizontal sections require
•In addition to the requirements below, follow the requirements provided with the vent.
Vertical Vent
Requirements
Use a roof flashing and storm collar whenever passing through the roof
Use a ceiling firestop whenever passing through a ceiling (or enclosure and at every floor penetration.
Vertical Termination
(use the "High Wind Terminatin"
Combustible
Framing
0" Clearance on vertical Sections to combustible surfaces (after the first firestop).
Horizontal Vent
Requirements
Use a firestop when passing through a wall. Make sure there is a 2" clearance above the vent.
0" Clearance
Combustible
Surfaces
2" Min.
1" Min.
© Travis Industries | 4040830 |