![1/2” Facing](/images/new-backgrounds/46285/4628519x1.webp)
10 | Installation (for qualified installers only) |
Nailing Brackets
There are two nailing brackets on the sides of the fireplace. Follow the directions below to prepare the nailing brackets. Once in place, nail or screw the nailing brackets to the framing.
1/2” Facing
For installations using 1/2” facing (1/2” drywall or other facing) fold the larger tab out 90°.
7/8” to 1” Facing
For installations using 1” facing (1/2” drywall with 3/8” tile, 7/8” tile, etc.) fold the shorter tab out 90°.
TOP VIEW
Framing
Fireplace | Nailing Bracket |
Drywall
1/8"
NOTE: When installed, there must be a minimum 1/8” gap between the face and facing.
TOP VIEW
Framing
Fireplace | Nailing Bracket |
|
Drywall
1/8"Tile
NOTE: When installed, there must be a minimum 1/8” gap between the face and facing.
© Travis Industries | 4040830 |