TABLE OF CONTENTS

SAFETY

4

RECEIVING AND STORAGE

4

UNPACKING AND HANDLING

4

STORAGE

4

PRINCIPLES OF OPERATION

5

FIGURE 1 -- MAGNAPLUS CIRCUIT DIAGRAM

5

FIGURE 2 -- TYPICAL MAGNAPLUS LAYOUT DIAGRAM

5

VOLTAGE REGULATION

6

MOTOR STARTING

6

PARALLEL OPERATION

6

NONLINEAR LOADING

6

INSTALLATION

6

PREPARATION FOR USE

6

GENERATOR MOUNTING

7

Single Bearing Units

7

Two Bearing Generators -- Direct Drive

7

Two Bearing Units -- Belt Driven

7

END PLAY TESTING

7

TORSIONAL VIBRATION

7

ENVIRONMENTAL CONSIDERATIONS

8

WIRING CONNECTIONS

8

OPERATION

11

PRE-START INSPECTION

11

START-UP

11

SHUTDOWN PROCEDURE

12

MAINTENANCE

12

DRYING WINDINGS

13

Space Heaters

13

Forced Air

13

TESTING

13

VISUAL INSPECTION

13

CONSTANT EXCITATION TEST

13

CONTINUITY / RESISTANCE TEST

13

INSULATION TEST

14

DIODE TESTING

14

SERVICE

14

GENERAL

14

FIELD FLASHING

14

BEARING REMOVAL

15

Opposite Drive End Bearing Bracket Removal

15

Drive End Bearing Bracket Removal, ........................................................................................................................................15

Two Bearing Units

.......................................15

BEARING REPLACEMENT

15

RECTIFIER ASSEMBLY REMOVAL

15

DIODE REPLACEMENT

15

 

2

Page 27
Image 27
Baldor TS80, BALDOR GENERATORS, TS25, TS45, TS175, TS130 manual Table of Contents