Indicators

Light

Status & Description

 

 

 

 

Power events

 

 

 

 

Orange

Off

Off

Stand-by mode.

Green

Off

Off

Powering up.

Flashing

 

 

 

 

Green

Off

Off

Normal operation.

 

 

 

• The projector needs 90 seconds to cool down as it was

 

 

 

 

abnormally shut down without the normal cooling down

 

 

 

 

process.

Orange

Off

Off

• The projector needs to cool for 90 seconds after the power

Flashing

 

is turned off.

 

 

 

 

 

 

• The projector has shut down automatically. If you try to re-

 

 

 

 

start the projector, it will shut down again. Please contact

 

 

 

 

your dealer for assistance.

 

 

 

 

 

 

 

 

 

Lamp events

Orange

Off

Red

The projector has shut down automatically. If you try to re-

start the projector, it will shut down again. Please contact your

Flashing

 

 

dealer for assistance.

 

 

 

 

 

 

 

 

Off

Off

Red

1.

The projector needs 90 seconds to cool down. Or

2.

Please contact your dealer for assistance.

 

 

 

 

 

 

 

 

Thermal events

Off

Red

Off

Off

Red

Red

Off

Red

Green

Off

Red

Orange

Red

Red

Red

Red

Red

Green

Red

Red

Orange

Green

Red

Red

Green

Red

Green

Green

Red

Orange

Orange

Red

Red

Orange

Red

Green

Orange

Red

Orange

Off

Green

Red

Off

Green

Green

The projector has shut down automatically. If you try to re- start the projector, it will shut down again. Please contact your dealer for assistance.

66 Maintenance

Page 66
Image 66
BenQ MX711, MX710 user manual Indicators, Light Status & Description Power events, Lamp events, Thermal events, Off Red