Black Box SW487A-R2 manual Installation, What’s Included, AC Line Voltage, Switch Placement

Models: SW487A-R2

1 50
Download 50 pages 34.28 Kb
Page 16
Image 16
CHAPTER 3: Installation

CHAPTER 3: Installation

3. Installation

3.1 What’s Included

(1) 6 x 4 Electronic SCSI Switch

(1) AC power cord

(1) 10-ft. (3-m) DB9-male-to-DB9-female RS-232 adapter

(1) DB9-male-to-DB25-female RS-232 adapter

(1) SCSI Switch control software CD-ROM

Rackmount handles and screws

Bottom feet

This users’ manual

If anything is missing or damaged, call Black Box at 724-746-5500.

3.2 AC Line Voltage

You can connect the SCSI Switch to any AC input voltage between 105 and

240 volts. Unless otherwise specified, the switch will be shipped with a 110-volt power cord for use in the USA. For a power cord that will work in your country (outside the USA), call Black Box Technical Support.

3.3 Switch Placement

Place the SCSI Switch in a convenient location near the host computer or peripherals. If you’ll be placing it on a flat surface, put the feet on the bottom of the switch. If you’ll be rackmounting it, use the procedure in Section 5.10. Keep SCSI cable lengths short to provide the best performance and reliability. Make sure that the dual fans and ventilation slots on the sides of the switch receive adequate airflow. Do not place the switch on or near any devices that generate excessive heat.

3.4 Power Equipment Off

Power off all equipment and peripherals connected to the SCSI interface before installing cables or terminators.

15

Page 16
Image 16
Black Box SW487A-R2 manual Installation, What’s Included, AC Line Voltage, Switch Placement, Power Equipment Off