recharges your body with static electricity (for example; DO NOT move or shuffle your feet, DO NOT touch un- grounded objects, etc.).
4.If you touch ungrounded objects (recharge your body with static electricity), firmly touch furnace again before touch- ing control or wires.
5.Use this procedure for installed and uninstalled (un- grounded) furnaces.
6.Before removing a new control from its container, dis- charge your body's electrostatic charge to ground to protect the control from damage. If the control is to be installed in a furnace, follow items 1 through 5 before bringing the control or yourself into contact with the furnace. Put all used AND new controls into containers before touching ungrounded objects.
7.An ESD service kit (available from commercial sources) may also be used to prevent ESD damage.
INTRODUCTION
The 345MAV Multipoise Condensing
These furnaces are shipped with the following materials to assist in proper furnace installation. These materials are shipped in the main blower compartment.
Installer Packet includes: |
|
Installation, |
|
Service and Maintenance Instructions |
|
User's Information Manual |
|
Warranty Certificate |
|
Loose Parts Bag includes: | Quantity |
Pressure tube extension | 1 |
Collector box or condensate trap extension tube | 1 |
Inducer housing drain tube | 1 |
2 | |
Drain tube coupling | 1 |
Drain tube coupling grommet | 1 |
Vent and | 2 |
1 | |
Vent Pipe Extension | 1* |
* (ONLY supplied with some furnaces)
This furnace must be installed with a
Before installing the furnace in the United States, refer to the NFGC and the NFPA 90B.
For copies of the NFGC and NFPA 90B contact the National Fire Protection Association Inc., Batterymarch Park, Quincy, MA 02269; or American Gas Association, 1515 Wilson Boulevard, Arlington, VA 22209.
Ð4Ð
Before installing the furnace in Canada, refer to the NSCNGPIC. Contact Standard Sales, CSA International, 178 Rexdale Boulevard, Etobicoke, (Toronto) Ontario, Canada M9W 1R3.
Installation must comply with regulations of serving gas supplier and local building, heating, plumbing or other codes in effect in the area in which installation is made. In absence of local codes, installation must comply with the NFGC in the United States and the NSCNGPIC in Canada.
These instructions cover minimum requirements for a safe instal- lation and conform to existing national standards and safety codes. In some instances, these instructions exceed certain local codes and ordinances, especially those that may not have kept pace with changing residential construction practices. We require these instructions as a minimum for a safe installation.
CAUTION: Application of this furnace should be in- doors with special attention given to vent sizing and material, gas input rate, air temperature rise, unit leveling, and unit sizing. Improper installation or misapplication of furnace can require excessive servicing or cause prema- ture component failure.
WARNING: Improper installation, adjustment, alter- ation, service, maintenance, or use can cause carbon monoxide poisoning, explosion, fire, electrical shock, or other conditions which may cause personal injury or property damage. Consult a qualified installer, service agency, local gas supplier, or your distributor or branch for information or assistance. The qualified installer or agency must use only
For accessory installation details, refer to applicable installation literature.
APPLICATIONS
I.GENERAL
Some assembly and modifications are required for furnaces installed in any of the 4 applications shown in Fig. 1. All drain and pressure tubes are connected as shown in Fig. 5. See appropriate application instructions for these procedures.
II.UPFLOW APPLICATIONS
An upflow furnace application is where furnace blower is located below combustion and controls section of furnace, and conditioned air is discharged upwards.
A.Condensate Trap Location
The condensate trap is factory installed in the blower shelf and factory connected for UPFLOW applications. A
B.Condensate Trap Tubing
NOTE: See Fig. 5 or tube routing label on main furnace door to confirm location of these tubes.
1.Collector Box Drain, Inducer Housing Drain, Relief Port, and Pressure Switch Tubes
These tubes should be factory attached to condensate trap and pressure switch ready for use in UPFLOW applications. These tubes can be identified by their connection location