Bunn G2 TRIFECTA, LPG-2, G9WD, G9-2T DBC, FPG-2 AC MOTOR AND GRIND CHAMBER cont, SERVICE Cont

Models: FPG-2 G9-2T DBC G9-2 G2 TRIFECTA G9 G9WD LPG-2

1 79
Download 79 pages 39.46 Kb
Page 17
Image 17
AC MOTOR AND GRIND CHAMBER (cont.)

SERVICE (Cont.)

AC MOTOR AND GRIND CHAMBER (cont.)

11.Clean all grinding burrs and mounting surfaces before reassembly.

12.Install the four .250”-20 cage nuts on the new motor.

13.Place the new motor with hopper collar and bush- ing into position on the bushings on the motor mounting bracket.

14.Using four .250”-20 screws, flat washers and rubber washers secure the motor to the mounting bracket.

15.Install stationary burr (9) to the grind chamber housing using two .250”-20 screws.

16.Install burr (7) and burr auger rotor/spring as- sembly (3) on to motor shaft.

17.Install motor shaft extension (11) on motor shaft.

18.Align the slot in the motor shaft extension (11) with the slot in the burr auger rotor/spring assembly

(6) and install shear plate (4).

19.Install burr rotor cup (5).

20.Install grind selector dial plate and grind selector knob assembly on the grind chamber housing and secure with two .250”-20 screws.

21.Refer to Fig. 4 and reconnect the wires.

22.Refer to ADJUSTMENTS in the Installation and Operating Manual, and reset the burrs.

WHI/BLU to

Relay N.O.(K4)

Manual background WHI to Cordset (120V)

RED/BLK to Cordset (230V)

GRN to Ground (120V)

GRN/YEL to Ground (230V)

 

P1310

FIG. 4 AC MOTOR TERMINALS

 

 

17

41545 122209

 

Page 17
Image 17
Bunn G2 TRIFECTA, LPG-2, G9WD, G9-2T DBC, FPG-2 service manual AC MOTOR AND GRIND CHAMBER cont, SERVICE Cont