Bunn G9WD OPERATING CONTROLS Continued Model MHG, Model G9-2TDBC, Power ON/OFF Pad e 100V Models

Models: FPG-2 G9-2T DBC G9-2 G2 TRIFECTA G9 G9WD LPG-2

1 79
Download 79 pages 39.46 Kb
Page 8
Image 8
OPERATING CONTROLS (Continued)

OPERATING CONTROLS (Continued)

Model MHG

Grind Pad (a)

Pressing initiates a timed grind cycle.

Stop Pad (b)

Pressing ends the operation of the grinder.

® PAD (c)

Pressing the ® pad allows programming access.

c

d

d

 

a

b

 

Hopper/Batch Selector Pads (d)

These pads are located on the funnel depictions on each side of the grinder with a total of 6 pads. Selecting one of these pads will select the amount of grind and side from which to grind.

Example: Selecting the lower pad on the left side will grind enough beans from the left hopper of the grinder to brew the amount programmed into grinder.

Control Board

The control board determines the amount of beans that will leave the hopper in a grind cycle. The timer portion can be adjusted to dispense a different amount from each hopper and each batch size. The scale is from 0.4 to 99.9 seconds. Refer to the Installation & Operating Manuals for Adjustments.

Model G9-2T DBC

Grind Pad (a)

d

Pressing initiates a timed grind cycle.

Stop Pad (b)

 

Pressing ends the operation of the grinder.

a

® PAD (c)

Pressing the ® pad allows programming access. e Model G9-2T DBCPower ON/OFF Pad (e) (100V Models)

c

d

Manual backgroundManual background b

Hopper/Batch Selector Pads (d)

These pads are located on the funnel depictions on each side of the grinder with a total of 6 pads. Selecting one of these pads will select the amount of grind and side from which to grind.

Example: Selecting the lower pad on the left side will grind enough beans from the left hopper of the grinder to brew the amount programmed into grinder.

Power ON/OFF Pad (e) (100V Models)

Pressing the ON/OFF pad alternately turns the grinder on and off.

Control Board

The control board determines the amount of beans that will leave the hopper in a grind cycle. The timer portion can be adjusted to dispense a different amount from each hopper and each batch size. The scale is from 0.4 to 99.9 seconds. Refer to the Installation & Operating Manuals for Adjustments.

8

41545 122209

 

Page 8
Image 8
Bunn G9WD, LPG-2, G2 TRIFECTA, FPG-2 OPERATING CONTROLS Continued Model MHG, Model G9-2TDBC, Power ON/OFF Pad e 100V Models