Cabletron Systems SEHI100TX-22 manual Tabletop Or Shelf Installation, Rackmount Installation

Models: SEHI100TX-22

1 88
Download 88 pages 20.99 Kb
Page 29
Image 29
4.3TABLETOP OR SHELF INSTALLATION

Tabletop or Shelf Installation

4.3TABLETOP OR SHELF INSTALLATION

This section provides guidelines for installation on a tabletop or shelf.

Tabletop and shelf installations must be within reach of the network cabling and meet the requirements listed below:

In a shelf installation, the shelf must be able to support 30 pounds of static weight for each device in the stack.

Maintain a temperature of between 5°C (41°F) and 40°C (104°F) at the installation site with fluctuations of less than 10°C per hour.

The SEHI must be located within seven feet of its power source and with an unrestricted free surface area as shown in Figure 4-2.

In order to allow for proper cooling, there must be a two-inch

!clearance on either side and the back of the unit.

CAUTION

6 IN.

21 IN.

HubSTACK 100BASE-TX HUB WITH LANVIEW®

SEHI100TX-22

 

RCV

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LNK

 

 

 

 

 

 

A

 

 

 

 

 

 

 

 

 

 

 

22 21 20 19 18 17 16 15 14 13 12

22X

21X

20X

19X

18X

17X

16X

15X

14X

13X

12X

PWR

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CPU

RCV

 

 

 

 

 

 

E

 

 

 

 

 

 

 

 

 

 

CLN

LNK

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

11 10 9 8 7

6

5

4

3

2

1

1

 

 

 

 

 

5X

4X

3X

2X

1X

 

 

 

 

 

 

 

 

11X

10X

9X

8X

7X

6X

EPIM 1

7 FT.

1511_03

Figure 4-2 Tabletop or Shelf Installation

Proceed to Section 4.5, Powering Up and Stacking the SEHI.

4.4RACKMOUNT INSTALLATION

To install the SEHI in a 19-inch rack, Cabletron Systems provides a kit with the SEHI that includes rackmount brackets, mounting screws, and a strain-relief bracket for cable management.

SEHI100TX User’s Guide

4-3

Page 29
Image 29
Cabletron Systems SEHI100TX-22 manual Tabletop Or Shelf Installation, Rackmount Installation