Cabletron Systems SEHI100TX-22 manual Repeat steps 3 through 6 until all SEH hubs are connected

Models: SEHI100TX-22

1 88
Download 88 pages 20.99 Kb
Page 34
Image 34
7. Repeat steps 3 through 6 until all SEH hubs are connected.

Chapter 4: Installation

3.Power up the SEH above the SEHI in the stack by plugging the power cord into the back panel of the SEH and plugging the other end into a grounded receptacle.

4.Verify that the PWR LED is on, indicating that the SEH is receiving power.

Do NOT connect the interconnect cable between the SEH and

!the SEHI before powering up the SEH. Otherwise damage to

CAUTION

the SEH may result.

 

5.Attach the HubSTACK Interconnect cable provided with the SEH to the “IN” port on the rear panel of the SEH as shown in Figure 4-6.

6.Attach the other end of the interconnect cable to the “OUT” port on the rear panel of the hub at the bottom of the stack.

Do not leave an interconnect cable connected at only one end

!during network operation. Corrupted data may result.

CAUTION

7. Repeat steps 3 through 6 until all SEH hubs are connected.

REAR VIEW

SEHI Managing 4 SEH Non-Intelligent Hubs

SEH100TX-22100BASE-TX HUB WITH LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEH100TX-22100BASE-TX HUB WITH LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEH100TX-22100BASE-TX HUB WITH LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEH100TX-22100BASE-TX HUB WITH LANVIEW®

OUT

SEH100TX INTERCONNECT

IN

SEHI100TX-22100BASE-TX HUB WITH LANVIEW®

OUT

SEHI100TX INTERCONNECT

IN

100BASE-TX HubSTACK Interconnect Cable

1511_07

Figure 4-6 Stacking the SEHI

4-8

SEHI100TX User’s Guide

Page 34
Image 34
Cabletron Systems SEHI100TX-22 manual Repeat steps 3 through 6 until all SEH hubs are connected