Contents
Page
Contents
Pre-DeliveryChecklist
Pre-Deliveryand Installation Checklist
Pre-DeliveryChecklist
Portable Spa
Keep your spa clean
Safety first
Planning the Best Location
Consider how you will use your spa
Outdoor equipment pack in-groundspas only
Allow for service access
LTR20091024, Rev. A
In-GroundSpa Site Preparation
Portable Spa Site Preparation
Site Excavation - Hard Bottom
Grading Prior to Excavation
Site Excavation - Sand Bottom
LTR20091024, Rev. A
Getting the Spa Into Your Yard
Check the Dimensions of Your New Spa
Plan the Delivery Route
Special Circumstances
LTR20091024, Rev. A
GFCI and Wiring Requirements
240 Volt Electrical Installation
Electrical Requirements
Electrical Requirements - US and Canada
Spa Model
Wires Required
GFCI Required
Configuring the 6300 Control System
Testing the GFCI Breaker
LTR20091024, Rev. A
LTR20091024, Rev. A
GFCI Wiring Diagram
Testing the GFCI Breaker
120 Volt Electrical Installation
230 Volt Electrical Installation
Electrical Installation --Europe
RCD and Wiring Requirements
Testing the RCD Breaker
Spa Model
Wires Required
GFCI Required
All 230V spas except
LTR20091024, Rev. A
RCD Wiring Diagram
LTR20091024, Rev. A
Installing the In-GroundShell
Equipment Pack Plumbing Connections In-GroundSpas
Designer Spa Specifications
DIJ401 and DIJ405
DIJ407
LTR20091024, Rev. A
Identifying Plumbing Lines
In-GroundPlumbing Connections
Air Test
Water Test
Gate/Slice Valves
Connecting Plumbing to Remote Equipment
LTR20091024, Rev. A
Remote Equipment Topside Control Panel
Electrical and Electronic Connection
at least 8” 20 cm above water level
In-GroundSpa Light Installation Instructions
at least 4” 10 cm above ground level, and
at least 48” 121 cm away from the spa
LTR20091024, Rev. A
LTR20091024, Rev. A
LTR20091024, Rev. A
Pouring the In-GroundSpa Deck
Spa Technical Specifications
Classic Series
Family II Series
Ultimate Fitness and Fitness Pro Series
LTR20091024, Rev. A 12/15/08