Contents
Page
Contents
Portable Spa
Pre-Deliveryand Installation Checklist
Pre-DeliveryChecklist
Pre-DeliveryChecklist
Consider how you will use your spa
Safety first
Keep your spa clean
Planning the Best Location
Outdoor equipment pack in-groundspas only
Allow for service access
LTR20091024, Rev. A
In-GroundSpa Site Preparation
Portable Spa Site Preparation
LTR20091024, Rev. A
Grading Prior to Excavation
Site Excavation - Hard Bottom
Site Excavation - Sand Bottom
Special Circumstances
Check the Dimensions of Your New Spa
Getting the Spa Into Your Yard
Plan the Delivery Route
LTR20091024, Rev. A
Electrical Requirements - US and Canada
240 Volt Electrical Installation
GFCI and Wiring Requirements
Electrical Requirements
Spa Model
Wires Required
GFCI Required
Configuring the 6300 Control System
Testing the GFCI Breaker
LTR20091024, Rev. A
LTR20091024, Rev. A
GFCI Wiring Diagram
Testing the GFCI Breaker
120 Volt Electrical Installation
Testing the RCD Breaker
Electrical Installation --Europe
230 Volt Electrical Installation
RCD and Wiring Requirements
All 230V spas except
Wires Required
Spa Model
GFCI Required
LTR20091024, Rev. A
RCD Wiring Diagram
LTR20091024, Rev. A
Installing the In-GroundShell
DIJ407
Designer Spa Specifications
Equipment Pack Plumbing Connections In-GroundSpas
DIJ401 and DIJ405
LTR20091024, Rev. A
Water Test
In-GroundPlumbing Connections
Identifying Plumbing Lines
Air Test
Gate/Slice Valves
Connecting Plumbing to Remote Equipment
LTR20091024, Rev. A
Remote Equipment Topside Control Panel
Electrical and Electronic Connection
at least 48” 121 cm away from the spa
In-GroundSpa Light Installation Instructions
at least 8” 20 cm above water level
at least 4” 10 cm above ground level, and
LTR20091024, Rev. A
LTR20091024, Rev. A
LTR20091024, Rev. A
Pouring the In-GroundSpa Deck
Spa Technical Specifications
Classic Series
Family II Series
Ultimate Fitness and Fitness Pro Series
LTR20091024, Rev. A 12/15/08