Contents
Page
Contents
Pre-DeliveryChecklist
Pre-Deliveryand Installation Checklist
Pre-DeliveryChecklist
Portable Spa
Planning the Best Location
Safety first
Keep your spa clean
Consider how you will use your spa
LTR20091024, Rev. A
Allow for service access
Outdoor equipment pack in-groundspas only
Portable Spa Site Preparation
In-GroundSpa Site Preparation
Site Excavation - Sand Bottom
Grading Prior to Excavation
Site Excavation - Hard Bottom
LTR20091024, Rev. A
Plan the Delivery Route
Check the Dimensions of Your New Spa
Getting the Spa Into Your Yard
Special Circumstances
LTR20091024, Rev. A
Electrical Requirements
240 Volt Electrical Installation
GFCI and Wiring Requirements
Electrical Requirements - US and Canada
GFCI Required
Wires Required
Spa Model
LTR20091024, Rev. A
Testing the GFCI Breaker
Configuring the 6300 Control System
GFCI Wiring Diagram
LTR20091024, Rev. A
120 Volt Electrical Installation
Testing the GFCI Breaker
RCD and Wiring Requirements
Electrical Installation --Europe
230 Volt Electrical Installation
Testing the RCD Breaker
GFCI Required
Wires Required
Spa Model
All 230V spas except
RCD Wiring Diagram
LTR20091024, Rev. A
Installing the In-GroundShell
LTR20091024, Rev. A
DIJ401 and DIJ405
Designer Spa Specifications
Equipment Pack Plumbing Connections In-GroundSpas
DIJ407
LTR20091024, Rev. A
Air Test
In-GroundPlumbing Connections
Identifying Plumbing Lines
Water Test
LTR20091024, Rev. A
Connecting Plumbing to Remote Equipment
Gate/Slice Valves
Electrical and Electronic Connection
Remote Equipment Topside Control Panel
at least 4” 10 cm above ground level, and
In-GroundSpa Light Installation Instructions
at least 8” 20 cm above water level
at least 48” 121 cm away from the spa
LTR20091024, Rev. A
LTR20091024, Rev. A
Pouring the In-GroundSpa Deck
LTR20091024, Rev. A
Spa Technical Specifications
Classic Series
Family II Series
Ultimate Fitness and Fitness Pro Series
LTR20091024, Rev. A 12/15/08