Enviro 6G50 76N instruction manual Table of Contents

Models: 6G50 76N

1 80
Download 80 pages 55.24 Kb
Page 5
Image 5

TABLE OF CONTENTS

SAFE INSTALLATION, USE AND SERVICE

2

Filling the Water Heater

18

APPROVALS

2

Vent Pipe Assembly

18

GENERAL SAFETY INFORMATION

3-4

Venting

18

TABLE OF CONTENTS

5

Vent Pipe Termination

19

INTRODUCTION

6

Planning The Vent System

20

Qualified Installer or Service Agency

6

Condensate

20-21

Preparing for the Installation

6

Blower Assembly Installation

21

TYPICAL INSTALLATION

7-9

Vent Terminal Installation, Sidewall

21-22

Mixing Valves

9

Installation of Vent System, Sidewall

23

LOCATING THE NEW WATER HEATER

10-13

Installation of Vertical Vent System

23

Facts to Consider About the Location

10

Vent Attenuation Assembly Installation Instructions.. 24-25

Insulation Blankets

11

Lighting and Operating Label

26

Air Requirements

11

TEMPERATURE REGULATION

27

Unconfined Space

12

FOR YOUR INFORMATION

28

Confined Space

12

Start Up Conditions

28

Fresh Air Openings For Confined Spaces

12

Operational Conditions

28

Outdoor Air Through Two Openings

12

PERIODIC MAINTENANCE

29-31

Outdoor Air Through One Opening

12

Venting System Inspection

29

Outdoor Air Through Two Horizontal Ducts

13

Burner OPERATION AND Inspection

29

Outdoor Air Through Two Vertical Ducts

13

Burner Cleaning

29

Air From Other Indoor Spaces

13

Housekeeping

29

INSTALLING THE NEW WATER HEATER

14

Anode Rod Inpection

29-30

Chemical Vapor Corrosion

14

Temperature-Pressure Relief Valve Test

30

Water Piping

14

Draining and Flushing

30-31

Space Heating and Potable Water Systems

14

Service

31

Closed Water Systems

14

LEAKAGE CHECKPOINTS

32

Thermal Expansion

15

REPAIR PARTS LIST

33

Temperature-Pressure Relief Valve

15-16

TROUBLESHOOTING GUIDELINES

34-36

High Altitude Installation

16-17

NOTES

37-38

Gas Piping

17

Limited Warranty

39

Sediment Traps

18

 

 

5

Page 5
Image 5
Enviro 6G50 76N instruction manual Table of Contents