Contents
Page
Contents
Pre-Deliveryand Installation Checklist
Pre-DeliveryChecklist
Pre-DeliveryChecklist
Portable Spa
Safety first
Keep your spa clean
Planning the Best Location
Consider how you will use your spa
LTR20091024, Rev. A
Allow for service access
Outdoor equipment pack in-groundspas only
Portable Spa Site Preparation
In-GroundSpa Site Preparation
Grading Prior to Excavation
Site Excavation - Hard Bottom
Site Excavation - Sand Bottom
LTR20091024, Rev. A
Check the Dimensions of Your New Spa
Getting the Spa Into Your Yard
Plan the Delivery Route
Special Circumstances
LTR20091024, Rev. A
240 Volt Electrical Installation
GFCI and Wiring Requirements
Electrical Requirements
Electrical Requirements - US and Canada
GFCI Required
Wires Required
Spa Model
LTR20091024, Rev. A
Testing the GFCI Breaker
Configuring the 6300 Control System
GFCI Wiring Diagram
LTR20091024, Rev. A
120 Volt Electrical Installation
Testing the GFCI Breaker
Electrical Installation --Europe
230 Volt Electrical Installation
RCD and Wiring Requirements
Testing the RCD Breaker
Wires Required
Spa Model
GFCI Required
All 230V spas except
RCD Wiring Diagram
LTR20091024, Rev. A
Installing the In-GroundShell
LTR20091024, Rev. A
Designer Spa Specifications
Equipment Pack Plumbing Connections In-GroundSpas
DIJ401 and DIJ405
DIJ407
LTR20091024, Rev. A
In-GroundPlumbing Connections
Identifying Plumbing Lines
Air Test
Water Test
LTR20091024, Rev. A
Connecting Plumbing to Remote Equipment
Gate/Slice Valves
Electrical and Electronic Connection
Remote Equipment Topside Control Panel
In-GroundSpa Light Installation Instructions
at least 8” 20 cm above water level
at least 4” 10 cm above ground level, and
at least 48” 121 cm away from the spa
LTR20091024, Rev. A
LTR20091024, Rev. A
Pouring the In-GroundSpa Deck
LTR20091024, Rev. A
Spa Technical Specifications
Classic Series
Family II Series
Ultimate Fitness and Fitness Pro Series
LTR20091024, Rev. A 12/15/08