Section 3. ET Instrumentation Installation
3)Connect the
4)Route the
ET106 ENCLOSURE
PC
+ RCV (red)
- RCV (black)
+ XMT (green)
- XMT (white)
- RCV (white)
+ RCV (green) | QC |
- XMT (black) | - S/N E1055 |
+ XMT (red) | SC932 |
|
+RCV (red)
-RCV (black)
+XMT (green)
-XMT (white)
To # 8
External Connector
Surge |
|
| Splices |
Protector |
| User | |
|
| Supplied | 1 |
|
| + RCV | |
| 1 | Cable | RED |
|
| 2 | |
| 2 |
| |
|
| - RCV | |
|
|
| BLACK |
| 3 |
| 3 |
|
|
| |
|
|
| + XMT |
| 4 |
| GREEN |
|
|
| 4 |
|
|
| - XMT |
WHITE
ENCLOSURE ET106
Earth Ground
FIGURE
3.4 Sealing and Desiccating the Enclosure
The ET Enclosure is supplied with a desiccant pack. The desiccant maintains a low humidity in the enclosure to minimize the chance of condensation on the instrumentation. Desiccant should be changed when the internal ET Enclosure humidity sensor measures 30% or higher. Install the desiccant as shown in Figure
1)Take the desiccant pack out of its sealed plastic bag. Place it under the desiccant strap just before leaving the station.
2)Be sure to close the enclosure hasp securely. A padlock may be used on the latch for extra security.