Section 1. Preparation and Siting

ET Tower

Tape measure (12’ to 20’)

Claw hammer

Level (24” to 36”)

Hand saw

Materials for concrete form:

(4)1" x 2" x 12" stakes

(2)2" x 4" x 96" lumber

(12)8p double-head nails

(8)16p double-head nails

20 ft form wire ½ Yard concrete Concrete trowel, edger

Electrical Fish tape or 20 feet of small diameter rope Wheelbarrow

UT30

Tape measure (12' and 20')

Nut driver (3/8")

Level (36" to 48")

Small sledge hammer

Pliers

Tie wire

Climbing harness

Hard hat

Haul rope (50')

Non-stretch line (20')

Wire rope cutters

Materials for B18 Base and UTEYE Anchors:

(4)Wood stakes 12" Pick or digging bar

Concrete form materials (2"x 4" lumber, stakes, saw, hammer, nails, etc.) Concrete trowel and edger

Materials for UTDUK Duckbill Anchors

Sledgehammer

Highlift jack

Chain (to attach jack to anchor loops)

Materials for RFM18 Base:

(3)anchors appropriate for mounting surface

(3)bolts and washers to secure base to anchors

1.2.2Tools for Instrumentation and Maintenance

All Towers

Lock and key for enclosure

Magnetic declination angle (Section 4)

Magnetic compass

Straight bit screwdrivers (small, medium, large)

Phillips-head screwdrivers (small, medium)

Small diagonal side-cuts

Needle-nose pliers

Wire strippers

Pocket knife

Calculator

Volt / Ohm Meter

Electrical Tape

1-3