Section 4. ET106 Sensor Arm Installation
4.5 RH and Temperature Radiation Shield
Mount the radiation shield to the sensor arm as shown in Figure
4.6 Pyranometer
Level the pyranometer as indicated in Figure
Leveling
Screws
FIGURE
4.7 Soil Temperature Sensor (Optional)
Bury the soil temperature sensor at the desired depth. To minimize solar loading of the sensor cable, bury the cable between the tower base and the sensor.
4.8 Sensor Verification and Clock Set
Check the measurements of all sensors after the datalogger is programmed. Display measurements using the *6 Mode with the CR10KD (refer to the laminated prompt sheet, or the Monitor Mode of the PC208 Datalogger Support Software.