
a.129secto. complete one revolution
b. 3600/129 = 27.9
c. 27.9 x 2 = 55.8 ft3 of gas flow/hr. d. 55.8 x 1050 = 58,590 Btuh input.
In this example, the nonfinal input rate for low stage is 58,500 Btu/hr, so the low stage manifold pressure is correctly set.
If the measured low stage rate is too low, increase the manifold pressure to increase rate. If the measured low stage rate is too high, decrease the manifold pressure to decrease rate.
NOTE:
4.Verify proper low stage gas heat temperature rise.
a.Furnace must operate within rise range listed on rating plate.
b.Select "COMFORT" or "EFFICIENCY" mode on UI.
"COMFORT" mode will provide a warmer supply air
temperature, while "EFFICIENCY" will provide lower gas consumption.
c.Make sure access panel is
d. Measure supply and return temperatures as close to the
unit as possible. Subtract the return temperature from
the supply temperature to deternfine rise. Rise should fall within the range specified on the rating plate.
5.Adjust manifold pressure to obtain high stage input rate (See Fig. 19).
a.Set unit to run for 20 minutes in
operation using the "INSTALLER CHECKOUT" menu on the UI.
b.Remove regulator adjustment cap from high stage gas valve pressure regulator (See Fig. 19) and turn
screwdriver) counterclockwise (out) to decrease rate and clockwise (in) to increase input rate.
NOTE: DO NOT set high stage manifold pressure less than 3.2 IN.W.C. or more than 3.8 IN. W.C. for natural gas. If manifold pressure is outside this range, change main burner orifices.
c.
d. Leave manometer connected.
6.Verify natural gas high stage input rate.
a.Turn off all other gas appliances and pilots served by the gas meter.
b.If unit is not running, set unit to run for 20 minutes in high stage gas heat operation using the "INSTALLER
CHECKOUT" menu on the UI.
c.Record number of seconds for gas meter to complete 1 revolution.
d. | Divide | number | of | seconds | in | step c. into | 3600 | (number | |||||||||||
| of seconds in 1 hour). |
|
|
|
|
|
|
|
|
|
|
| |||||||
e. | Multiply |
| result | of | step |
| d. by | the number | of | cubic | feet | ||||||||
| shown for one revolution of test dial to obtain cubic feet | ||||||||||||||||||
| of gas flow per hour. |
|
|
|
|
|
|
|
|
|
|
| |||||||
f. | Multiply |
| result | of | step |
| f. by | Btu heating | value | of | the | gas | |||||||
| to obtain total measured input shown in Table 4. |
|
| ||||||||||||||||
| (Consult | the | local | gas | supplier | if the | heating value of | ||||||||||||
| gas is not known). |
|
|
|
|
|
|
|
|
|
|
|
|
| |||||
EXAMPLE: |
| Assume | a | 90,000 |
| high | stage | input | unit | is being | |||||||||
installed. | Assume | that | the |
| size | of the dial is 2 cubic | ft., | one | |||||||||||
revolution | takes | 84 | sec., | and | the | heating | value | of | the | gas | is | 1050 | |||||||
Btu/ft3. Proceed | as | follows: |
|
|
|
|
|
|
|
|
|
|
|
|
| ||||
a. | 84 sec. | to | complete |
| one | revolution |
|
|
|
|
|
| |||||||
b. | 3600/84 | = 42.9 |
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||
c. | 42.9 | x | 2 = 85.8 | ft3 | of | gas | flow/hr. |
|
|
|
|
|
| ||||||
d. | 85.8 | x | 1050 | = 90,090 | Btuh |
| input. |
|
|
|
|
|
|
In this example, the nonfinal input rate for high stage is 90,000 Btu/hr, so the high stage manifold pressure is correctly set.
If the measured high stage rate is too low, increase the manifold pressure to increase rate. If the measured high stage rate is too high, decrease the manifold pressure to decrease rate.
NOTE:
7.Verify proper high stage gas heat temperature rise.
a.Furnace must operate within rise range listed on rating plate.
b.Make sure access panel is
c.Measure supply and return temperatures as close to the unit as possible. Subtract the return temperature from the supply temperature to deternfine rise. Rise should fall within the range specified on the rating plate.
NOTE: If the temperature rise is outside the rating plate range, first check:
a. Gas input for low and high stage gas heat operation. b. Derate for altitude, if applicable.
c. Return and supply ducts for excessive restrictions causing static pressures in excess of .5 IN. W.C.
d. Make sure model plug is installed.
8.Final Check
a.Turn off gas to unit
b. Remove manometer from pressure tap.
c.Replace pipe plug on manifold (See Fig. 20). d. Turn on gas to unit.
e.Check for leaks.
CHECK GAS INPUT (PROPANE GAS)
Refer to propane kit installation instructions for properly checking gas input.
NOTE: For installations below 2,000 ft (610 m), refer to the unit rating plate for proper propane conversion kit. For installations
above 2,000 ft (610 m), contact your distributor for proper propane conversion kit.
CHECK BURNER FLAME
With burner access panel removed, observe the unit heating
operation. Watch the burner flames to see if they are light blue and
soft in appearance, and that the flames are approximately the same
for each burner. Propane will have blue flame (See Fig. 21). Refer
to the Maintenance section for information on burner removal.
MANIFOLD | PIPE PLUG |
099019
Fig. 20 - Burner Assembly
24